Two major intersection upgrades on Brand Highway at Mogumber Road and Harris road, plus 22km of shoulder widen and seal with associated drainage structures.
Client: Main Roads WA
- Complex traffic management
- Drainage structures
- Top up and mix existing shoulders
Start date
|
April 2017
|
Date for practical completion
|
July 2017
|
Original contract period (weeks)
|
15 Weeks
|
Prequalification level
|
R2
|
Aspects related to pre-qualification level
|
- Significant longitudinal bitumen joints
- SMA Asphalt and PMB Seal works
- Construction of drainage structures
- Complex traffic management
|