This project involved the construction and seal of 7km of bitumen haul road. The road was constructed in challenging terrain with several large creek crossings and including tie-ins with existing haul roads, requiring interface with heavy haulage traffic.
The scope of works comprised clearing, grubbing and stripping of topsoil; earthworks; borrow pit management and rehabilitation; pavement construction (subgrade, subbase and basecourse placement); drainage including culvert and floodway installation; and traffic management.
Client: BC Iron
Location: Nullagine, WA