Indian Ocean Drive Project

Central Earthmoving delivered major road upgrade works along Indian Ocean Drive between Leeman and Brand Highway in regional Western Australia, improving safety, traffic flow, and long-term...

Read more

Lynas' Project

Central Earthmoving delivered major civil and earthworks packages for Lynas Rare Earths at the Mt Weld operation in regional Western Australia, supporting the expansion of one of the world’s...

Read more

Overtaking Lanes, Great Northern Highway - Newman to Auski

Centrals are very happy to have won the Great Northern Highway Overtaking Lanes contract, between Newman and Auski for MRWA.

Read more

Indian Ocean Drive Road Improvements - Leeman to Brand Highway

Centrals are very happy to have won the Construction of Road Improvements – Indian Ocean Drive Stage 2 – Leeman to Brand Highway for MRWA.

Read more

Lynas Rare Earthworks Package

  • 250,000m3 of bulk earthworks provisioning for planned process plant expansion and other infrastructure at the Mt Weld mine site
  • Realignment and reconstruction of existing roads to facilitate...
Read more

Fortnum Gold Mine - Tailings Storage Facility Raise

Fortnum TSF lift

  • 4m active tailing dam wall lift
  • 100,000m3 tailings to be placed
  • Decant extension (including precast elements)
Read more

Cosmos Nickel Mine - Belleview Aerodrome Upgrade

  • Refurbishment of existing runway in the Northern Goldfields
  • Over 85,000m2 of pavement rehabilitation
Read more

Golden Grove Mine - Tailings Storage Facility Raise

  • 3m Lift of original tailings dam
  • Production of conforming construction material for inner wall, outer wall, and rock buttressing
Read more

Goldfields Hwy - Shoulder Widening

  • 60km of asphalt shoulder widening on Goldfields Hwy
  • Works include pavement asphalt, line marking and signage
Read more

Coolgardie Esperance Hwy - Shoulder Widening

  • 104km of shoulder widening on Coolgardie-Esperance Hwy
  • Works include pavement construction, sealing, line marking and signagE
Read more

Great Central Road - Outback Way Project

The Wongutha Way Alliance combines the skills of Main Roads Western Australia, Carey Group and Centrals

Read more

Boddington Gold Mine - General Earthwork Services

  • Mine Site Road Maintenance
  • Dust Suppression
  • Material Cartage
  • Remote Skid Steer Op...
Read more

Cataby Mineral Sands Mine - Site & Public Access Roads

Construction of internal roads plus widening and intersection. Upgrade of Brand Highway.

Read more

DeGrussa Copper Mine - Monty Boxcut & Civil Works

This project included the earthworks and civil construction for the Monty Project (Monty) located approximately 10km east of the existing DeGrussa Copper Mine and located approximately 900km...

Read more

North West Coastal Hwy - NWC Hwy/Olsen Rd Intersection

Centrals were engaged by Main Roads WA to construct North West Coastal Highway. The works under this contract involved relocation of the existing intersection approximately 300m to the south in order ...

Read more

Indian Ocean Drive - Shoulder Widening

The works entailed shoulder widening and seal on Indian Ocean Drive at two locations, Leeman and Greenhead, in order to achieve a minimum of 9m seal on an 11m formation.

Read more

Arcadia Waters Geraldton - Subdivision Works

This 17 lot project comprised earthworks, civil works, roads and associated infrastructure, services installation, limestone boundary walls, fencing and gates, landscaping and improvements associated ...

Read more

Exmouth - Town Centre Revitalisation

This project was delivered in four stages to revitalise the townsite of Exmouth – Western Car Park and Thew Street extension; Thew Street reconstruction; Kennedy Street reconstruction; and...

Read more

Horwood Road Deepdale - Subdivision Works

Centrals undertook the earthworks and civil works for the Stages 1 and 2 of the Deepdale by the River Estate, located ten kilometres from Geraldton’s CBD.

The scope of work for these 63 lots...

Read more

Nullagine Iron Ore Project - Warrigal Haul Rd Construction

This project involved the construction and seal of 7km of bitumen haul road.  The road was constructed in challenging terrain with several large creek crossings and including tie-ins with...

Read more

Bringo & Glengarry Stations - Mid West Rail Upgrade Civil Works

This project involved the widening of embankments and cuttings to accommodate wider track on the Geraldton – Mullewa line between the Glengarry and Bringo Stations. Centrals were responsible...

Read more

Seacrest Estate Geraldton - Subdivision Works

Centrals have undertaken several stages of the Seacrest Estate, located six kilometres from Geraldton’s CBD, including:

  • Stage 14 Earthworks and Civil Works for 86 lots
  • Stages 7, 8 and 9...
Read more

Golden Grove Mine - Airstrip Upgrade

These projects involved reshaping the footprint of the strip and upgrading drainage. The strip was sheeted with 150 mm gravel, sealed with sand seal; and line-marked. The result was an all-weather...

Read more