Specialists in mine site rehabilitation incorporating proven technology to improve productivity and accuracy of completed works.
Construction of internal roads plus widening and intersection. Upgrade of Brand Highway.
Works carried out in an environmentally sensitive area. Entire project classed as a dieback region, TEC located on the southern boundary of ...
Construction of 4 new overtaking lanes and pavement widening and associated road drainage structures SLK 52 – 68 Indian Ocean Drive.
The works entailed shoulder widening and seal on Indian Ocean Drive at two locations, Leeman and Greenhead, in order to achieve a minimum...
This project involved flood reinstatement works at several locations in the Yalgoo Shire. The works included pavement and shoulder...
Widen & Overlay Wubin-Mullewa Road SLK 152.55 to SLK 154.00.
Centrals were engaged by Main Roads WA to construct North West Coastal Highway. The works under this contract involved relocation of the...
This contract entailed Centrals supplying plant and equipment, along with competent licensed operators for the construction of roadworks...
Two major intersection upgrades on Brand Highway at Mogumber Road and Harris road, plus 22km of shoulder widen and seal with associated...
This project involved flood reinstatement works at several locations in the Mullewa District. The works predominantly involved...
This project included the earthworks and civil construction for the Monty Project (Monty) located approximately 10km east of the existing...
This project was for the upgrade of the Loop-Z Bend Access Road and associated carpark located in the environmentally sensitive Kalbarri...
This project involved the construction and seal of 7km of bitumen haul road. The road was constructed in challenging terrain with...
Centrals undertook the earthworks and civil works for the Stages 1 and 2 of the Deepdale by the River Estate, located ten kilometres from...
This project is to realign 1.6 kilometres of the Great Northern Highway, 45 kilometres north of Meekatharra. The works are being...
This project was delivered in four stages to revitalise the townsite of Exmouth – Western Car Park and Thew Street extension; Thew...
Centrals has been working continuously at the Golden Grove mine site for over 20 years having delivered various work packages ranging from...
Centrals were engaged to mulch the verge of approximately 75 kilometres of the Yandi mine main access road. The mulching significantly ...
This project involved the widening of embankments and cuttings to accommodate wider track on the Geraldton – Mullewa line between the ...
Centrals mulched approximately 200 kilometres of seismic access corridors. To minimise the duration in the field and ensure cost effective...
This project involved the decommissioning of existing roads and the construction of new entry roads into the Geraldton Port. This...
This project was for the construction of a 90 kilometre pipeline and associated infrastructure for Rio Tinto in the Millstream-Chichester...
This project involved the decommissioning of existing roads and the construction of new entry roads into the Geraldton Port. The scope of...
This 17 lot project comprised earthworks, civil works, roads and associated infrastructure, services installation, limestone boundary...
Centrals have undertaken several stages of the Seacrest Estate, located six kilometres from Geraldton’s CBD, including:
These projects involved reshaping the footprint of the strip and upgrading drainage. The strip was sheeted with 150 mm gravel, sealed with...
After the withdrawal of the US Navy from this facility, Centrals were engaged by the Department of Defence to conduct substantial...