Skip to main content
Arrow Up
  • About Us
  • Contact Us
  • info@centrals.com.au
  • Phone+61 8 9965 6565
Centrals
  • Corporate
    • Our People
    • Our Vision & Values
    • Corporate Structure
  • Capabilities
    • Civil
    • Mining
    • Buru Centrals Rehabilitation
    • Landcare & Mulching
  • Projects
    • Civil
    • Mining
    • Site Rehabilitation
  • Sustainability
    • Community
    • Aboriginal Engagement
    • HSEQ
  • News
  • Work with us
sgs_iso45001 sgs_iso14001 sgs_iso9001
Picture: Centrals
Centrals
Picture: Centrals 2
Centrals 2
Picture: Centrals 3
Centrals 3
Picture: Centrals 4
Centrals 4
Picture: Centrals 5
Centrals 5
Picture: Centrals 6
Centrals 6
Picture: Centrals 7
Centrals 7
Picture: Centrals 8
Centrals 8

Centrals

  • Home
  • Projects

Projects

Sort By:
Buru Centrals Rehabilitation

Specialists in mine site rehabilitation incorporating proven technology to improve productivity and accuracy of completed works.

View more
Iluka Resources – Site & Public Access Roads

Construction of internal roads plus widening and intersection. Upgrade of Brand Highway.

View more
Roadbase and Stemming Crushing - Newmont
  • 24 hour crushing operation
  • Production of Roadbase and Stemming Material
  • Special material campaigns
View more
General Earthworks - Newmont
  • Mine Site Road Maintenance
  • Dust Suppression
  • Material Cartage
  • Remote Skid Steer Op...
View more
Construction of the new alignment of Coalfields Highway at Bowelling Curves intersection, Collie, WA

Works carried out in an environmentally sensitive area. Entire project classed as a dieback region, TEC located on the southern boundary of ...

View more
Indian Ocean Drive - Passing Lanes SLK 52 - 68

Construction of 4 new overtaking lanes and pavement widening and associated road drainage structures SLK 52 – 68 Indian Ocean Drive.

View more
Indian Ocean Drive

The works entailed shoulder widening and seal on Indian Ocean Drive at two locations, Leeman and Greenhead, in order to achieve a minimum...

View more
Yalgoo Flood Repairs

This project involved flood reinstatement works at several locations in the Yalgoo Shire.  The works included pavement and shoulder...

View more
Widen and Overlay – Wubin to Mullewa Road

Widen & Overlay Wubin-Mullewa Road SLK 152.55 to SLK 154.00.

View more
North West Coastal Highway and Olsen Road Intersection Improvements

Centrals were engaged by Main Roads WA to construct North West Coastal Highway. The works under this contract involved relocation of the...

View more
Rural Roads Flood Repairs

This contract entailed Centrals supplying plant and equipment, along with competent licensed operators for the construction of roadworks...

View more
Shoulder Widen and Seal (51-65 SLK) Intersection upgrade Brand Hwy, Mogumber Road and Orange Springs Road

Two major intersection upgrades on Brand Highway at Mogumber Road and Harris road, plus 22km of shoulder widen and seal with associated...

View more
Mullewa Flood Repairs

This project involved flood reinstatement works at several locations in the Mullewa District.  The works predominantly involved...

View more
Boxcut Development , Haul Road and Access Roads

This project included the earthworks and civil construction for the Monty Project (Monty) located approximately 10km east of the existing...

View more
Kalbarri Z-Bend Access Road

This project was for the upgrade of the Loop-Z Bend Access Road and associated carpark located in the environmentally sensitive Kalbarri...

View more
Warrigal Haul Road Construction

This project involved the construction and seal of 7km of bitumen haul road.  The road was constructed in challenging terrain with...

View more
Loop Z Access Road for the Department of Environment & Conservation

This project was for the upgrade of the Loop-Z Bend Access Road and associated carpark located in the environmentally sensitive Kalbarri...

View more
Deepdale North Stages 1 & 2 for Aeges

Centrals undertook the earthworks and civil works for the Stages 1 and 2 of the Deepdale by the River Estate, located ten kilometres from...

View more
Great Northern Highway Realignment for Doray Minerals

This project is to realign 1.6 kilometres of the Great Northern Highway, 45 kilometres north of Meekatharra.  The works are being...

View more
Exmouth Town Centre Rejuvenation for the Shire of Exmouth

This project was delivered in four stages to revitalise the townsite of Exmouth – Western Car Park and Thew Street extension; Thew...

View more
Golden Grove Site Services for MMG

Centrals has been working continuously at the Golden Grove mine site for over 20 years having delivered various work packages ranging from...

View more
Yandi Access Road for BHP Billiton Iron Ore

Centrals were engaged to mulch the verge of approximately 75 kilometres of the Yandi mine main access road. The mulching significantly ...

View more
Glengarry and Bringo Rail Works for Brookfield Rail

This project involved the widening of embankments and cuttings to accommodate wider track on the Geraldton – Mullewa line between the ...

View more
West Erregulla Seismic Corridors for Warrego Energy

Centrals mulched approximately 200 kilometres of seismic access corridors. To minimise the duration in the field and ensure cost effective...

View more
Service Relocation & Access Roads at Geraldton Port for Karara Mining

This project involved the decommissioning of existing roads and the construction of new entry roads into the Geraldton Port.  This...

View more
Coastal Waters Projects for Monadelphous

This project was for the construction of a 90 kilometre pipeline and associated infrastructure for Rio Tinto in the Millstream-Chichester...

View more
Realignment of Port access roads and installation of facility roads

This project involved the decommissioning of existing roads and the construction of new entry roads into the Geraldton Port. The scope of...

View more
Arcadia Waters Stage 2 for Arcadia Waters Midwest

This 17 lot project comprised earthworks, civil works, roads and associated infrastructure, services installation, limestone boundary...

View more
Seacrest Estate

Centrals have undertaken several stages of the Seacrest Estate, located six kilometres from Geraldton’s CBD, including:

  • Stage 14...
View more
Golden Grove Airstrip Upgrade Stages 1 & 2 for MMG

These projects involved reshaping the footprint of the strip and upgrading drainage. The strip was sheeted with 150 mm gravel, sealed with...

View more
Harold E Holt Naval Base Remediation Works

After the withdrawal of the US Navy from this facility, Centrals were engaged by the Department of Defence to conduct substantial...

View more

Recent News

  • Aboriginal Engagement Award
  • Outback Way – Wongutha Way Alliance
  • Walebing Curves
  • Indian Ocean Drive Passing Lanes MRD
  • Bowelling Curves Collie (MRD)
  • Iluka internal roads

Induction

Induction Form

Supply with Us

Supply Terms & Conditions

Dry Hire Purchase Order Terms and Conditions

Wet Hire Purchase Order Terms and Conditions

Compliance

Accreditations

WA Centrals Locations
centrals logo
  • Central Earthmoving Company Pty Ltd
    ABN: 31 114 978 675
  • 222 Goulds Road, Narngulu WA 6532
    PMB 5001, Geraldton WA 6531
  • 183 Great Eastern Highway
    Belmont WA 6104
  • Phone: +61 8 9965 6565
  • Email: info@centrals.com.au

© 2018 Central Earthmoving Company

Sitemap | Privacy Policy

Market Creations
Site by Market Creations