Client

MMG Limited

Division

Civil & Mining

Commenced

Completed

Location

Yalgoo, WA

Airstrip Upgrade

These projects involved reshaping the footprint of the strip and upgrading drainage. The strip was sheeted with 150 mm gravel, sealed with sand seal; and line-marked. The result was an all-weather airstrip which could cater for larger aircraft.  In the second stage, the sand seal was removed; drainage was further upgraded to include the runway apron and carkpark; clearing was undertaken to provide a 30 degrees sight zone for pilots (a safety requirement); two-coat seal applied to the runway, apron and carpark; linemarking; strip lighting; and solar powered wind sock.